THE Next Generation Hybrid Adhesive

THE Next Generation Hybrid Adhesive

Introducing our latest BIS-HY Hybrid Generation 2 chemical anchor. Our BIS-HY Hybrid Gen 2 is an upgrade on our original Hybrid epoxy that has revolutionized chemical anchoring by combining the superior strength of an Epoxy with fast curing characteristics. 

ICCONS BIS-HY Hybrid Gen 2 Adhesive can be used anywhere requiring threaded rod or rebar into concrete. Whether you require anchorage for structural steel connections such as steel beams or columns to concrete, structures such as racking, sound barriers or fencing, our BIS-HY Hybrid Gen 2 is the safest choice. Furthermore, any seismic anchoring, retrofitting structures to concrete or post-installed rebar requirements, our Hybrid Gen 2 is the ultimate choice.

Our original BIS-HY Hybrid had some of the highest load capacity for anchors available on the market, and we have again increased that capacity with our BIS-HY Hybrid Gen 2! Our original BIS-HY Hybrid was the first rapid cure chemical in Australia to have the most stringent seismic anchor testing available globally “C2 approvals” for threaded rod. We have extended that testing to include more sizes for BIS-HY Hybrid Gen 2!

We have not only improved the load performance and technical breadth of our Hybrid we have also enabled it to be used with our Set Safe Dustless Drilling system. Holes not cleaned properly can greatly reduce the performance of chemical anchoring. You can now install our BIS-HY Hybrid Gen 2 with our dustless drill bits and eliminate this element completely. This results in greatly reduced install time by removing the need to clean anchor holes and more importantly has an increased level of Occupational Health and Safety by minimising exposure to silica dust.

Our BIS-HY Hybrid Gen 2 is the most comprehensive adhesive anchor in the market, it is: 

  • Extreme Load Performance
  • Compliant to the National Construction Code 2019
  • ETA Approved
  • C1 and C2 Seismic Tested
  • Fire-rated to 120 minutes
  • Low VOC for green projects
  • AS/NZS potable water approved
  • Water flooded holes approved
  • Approved for use with Dustless Drill Bits
  • Rapid Cure - 3 minute working time and 30 minute curing time (20 Degrees Celcius)
  • Available on our software to design to AS5216:2018 Design of post-installed and cast-in fastenings in concrete

This revolutionary adhesive injection system lends incredible characteristics to almost all adhesive anchor applications in the professional and DIY spaces. 

Customer Testimonials

“We will continue to work closely with ICCONS as their engineering and technical department are incredibly easy to deal with, they are also able to manage their tasks without us needing to follow up.”

Rory, Fitzgerald Constructions
Customer testimonial

“The team at ICCONS had an answer for all our questions, and if they were not sure, there was no stress in doing what they could to track down the right information. They were a breeze to work with and I couldn't believe that we had the whole testing process done and reports handed over within the week. That’s unheard of in this game.”

David, Hutchinson Builders
Customer testimonial

“The ICCONS engineering support, site load testing and ease of purchasing their product range through local distribution is a whole package of support that suits our business perfectly.”

Greg, Robert Guy and Sons
Customer testimonial

“I must make a special mention to the engineering team at ICCONS, they were unbelievably professional in their approach and absolutely proficient in their knowledge. The BIS–HY is an incredible new platform and a market leading product. Great work!”

Daniel, Hutchinson Builders
Customer testimonial

“We have used the ICCONS product on many a Starter Bar and Cross Stitching Project and always recommend them to the Designer and Builder as our preferred product.”

Lee, Robert Guy and Sons
Customer testimonial

“I am learning every day in my job here at Fitzgerald’s. It was great to see the ICCONS team come into the fold here on site. They went about their work professionally and swiftly attaining the answers we needed to get on with the job.”

Jane, Fitzgerald Constructions
Customer testimonial

“We use a full fleet of ICCONS GT-6 Gas Tools extensively every day and we cannot fault the product, service or quality that ICCONS provides. We highly recommend them!”

John, Advanced Pest Control
Customer testimonial